So to catch you up - here is how it all began...
The renovations on the basement officially started on March 4th, 2009. (Based on the date stamp from my photos)
![march4](http://farm4.static.flickr.com/3615/3686832557_ba30a9fbaf_o.jpg)
Aubrey had to break up the concrete so that we could get to the plumbing, so that it could be replaced.
![march9](http://farm3.static.flickr.com/2666/3687648592_6f005f2e9e_o.jpg)
In the backyard we had small bins delivered (I think there were 4 that came and went over the course of the demo) to remove the concrete and dirt. It's neat looking back as snow was still on the ground. (And as I type, it's gorgeous + sunny out)
![march30](http://farm4.static.flickr.com/3618/3687658890_1d3ee21427_o.jpg)
Here is a picture of our old stairs...
![march30B](http://farm3.static.flickr.com/2601/3687663914_0a15c34401_o.jpg)
The plumbing beneath the floor was all replaced, and once that was done, the new floor went in, which was amazing, as for the first time, we were going to have an actual FLAT floor. Previously it was a mountain terrain, which made putting down flooring impossible. :)
![April2](http://farm4.static.flickr.com/3651/3686874807_f84d533210_o.jpg)
And the stair building continues...
![April22](http://farm3.static.flickr.com/2616/3686888755_9879827e25_o.jpg)
![April22](http://farm3.static.flickr.com/2548/3687698614_d20e8edbde_o.jpg)
There are more pictures but I'm going to add to this posting late so it's all up to date. :)